|
09-001
|
(Not On Map)
|
|
Little Campbell Creek Drainage Basin Study
|
Category:
Storm Drain and Water Quality Improvements
Status:
A/E Negotiations phase
Scope:
not available
|
|
09-002
|
(Not On Map)
|
|
Jewel Lake/Goose Lake/Valley of the Moon Park Safety
|
Category:
Parks and Trails
Status:
Final Design phase
Scope:
not available
|
|
09-003
|
(Not On Map)
|
|
Westchester Lagoon/Chester Creek Flooding
|
Category:
Storm Drain and Water Quality Improvements
Status:
Design Study phase
Scope:
Study will evaluate causes and explore costs/options related to dredging the lagoon.
|
|
09-004
|
|
|
Vanguard Dr Upgrade/Extension - Academy Dr to Abbott Rd
|
Category:
Road Improvements
Status:
Proposed
Scope:
No scope or route has been set, but improvements would likely include road realignment, pedestrian facilities, street lighting, and improved drainage.
|
|
09-005
|
(Not On Map)
|
|
Sandpiper Dr Road and Drainage Improvements
|
Category:
Road Improvements
Status:
Construction phase
Scope:
Construct road and drainage improvements.
|
|
09-006
|
(Not On Map)
|
|
3rd Ave Retaining Wall Replacement - H St to K St
|
Category:
Road Improvements
Status:
Set Up phase
Scope:
Identify and build long term options for the retaining wall.
|
|
09-007
|
(Not On Map)
|
|
Traffic Calming Improvements, 2010
|
Category:
Traffic Department Projects
Status:
Proposed
Scope:
not available
|
|
09-008
|
(Not On Map)
|
|
ADA Improvements, 2010
|
Category:
ADA Improvements
Status:
Design Study phase
Scope:
Upgrade pedestrian facilities along roads to ADA standards.
|
|
09-009
|
(Not On Map)
|
|
Lake Otis Pkwy Fence Rehab - west side north of Northern Lights Blvd
|
Category:
Miscellaneous Improvements
Status:
Construction phase
Scope:
Replace fence boards and paint.
|
|
09-010
|
(Not On Map)
|
|
36th Ave/MacInnes St and Providence Dr/Spirit Way Signalization
|
Category:
Traffic Department Projects
Status:
Final Design phase
Scope:
Install traffic signals at these intersections.
|
|
09-011
|
(Not On Map)
|
|
Lake Otis Pkwy @ 20th Ave Channelization
|
Category:
Traffic Department Projects
Status:
Design Study phase
Scope:
This project will construct safety improvements to this intersection. Dedicated left-hand turn lanes on Lake Otis Parkway are anticipated. The curb bulb-out on
more ...
|
|
08-001
|
(Not On Map)
|
|
Miscellaneous Construction Services, 2008/2009
|
Category:
Road Improvements
Status:
Construction phase
Scope:
Repair road and drainage all over town.
|
|
08-004
|
|
|
Independence Dr Upgrade/Extension - Colony Loop to O'Malley Rd
|
Category:
Road Improvements
Status:
Design Study phase
Scope:
The project will upgrade and extend the road to urban collector standards. Improvements are expected to include pavement, curbs, storm drains, street lighting,
more ...
|
|
08-006
|
|
|
Dowling Road Upgrade (East) - Lake Otis Pkwy to Elmore Rd
|
Category:
State Routes
Status:
Preliminary Design phase
Scope:
Improvements are expected to include a road base, pavement, curbs, pedestrian facilities, street lighting, storm drains, and landscaping.
|
|
08-007
|
(Not On Map)
|
|
Little Campbell Creek at 84th Ct Flooding and Fish Passage Improvements
|
Category:
Storm Drain and Water Quality Improvements
Status:
Design Study phase
Scope:
This project will construct drainage improvements in the Little Campbell Creek watershed. Specifically, a 360-foot culvert that conveys the creek is undersized
more ...
|
|
08-008
|
(Not On Map)
|
|
Spruce St Extension/Upgrade - Dowling Rd to 68th Ave
|
Category:
Road Improvements
Status:
Design Study phase
Scope:
While the scope has not been set, urban collector improvements typically include a new road base, curbs, pavement, pedestrian facilities on both sides, storm dr
more ...
|
|
08-009
|
(Not On Map)
|
|
Gambell St Paving and Drainage - Klatt Rd to 120th Ave
|
Category:
Storm Drain and Water Quality Improvements
Status:
Preliminary Design phase
Scope:
The project will install storm drains, a lift station, and strip pave the road surface.
|
|
08-010
|
(Not On Map)
|
|
Potter Heights Subd Area Gas Improvement District
|
Category:
Miscellaneous Improvements
Status:
Construction phase
Scope:
Construct natural gas main to serve this subdivision.
|
|
08-011
|
(Not On Map)
|
|
11th Ct Upgrade - Muldoon Rd to Boston St
|
Category:
Road Improvements
Status:
Set Up phase
Scope:
Upgrade existing road, possibly strip paving.
|
|
08-012
|
|
|
73rd Ave Strip Paving - Petersburg St to Basel St
|
Category:
Road Improvements
Status:
Preliminary Design phase
Scope:
Install a new road base, pavement, drainage, and lighting.
|
|
08-013
|
|
|
74th Ave Strip Paving - Petersburg St to Basel St
|
Category:
Road Improvements
Status:
Preliminary Design phase
Scope:
Install a new road base, pavement, drainage, and lighting.
|
|
08-014
|
(Not On Map)
|
|
79th Ave Strip Paving - Hartzell Rd to Petersburg St
|
Category:
Road Improvements
Status:
Design Study phase
Scope:
Construct a two lane, strip-paved roadway with storm drains and street lighting.
|
|
08-016
|
|
|
Bluebell Dr at Goldenview Dr Intersection Safety Improvements
|
Category:
Safety Improvements
Status:
Design Study phase
Scope:
This project will construct safety improvements to this intersection. Exact scope will be determined during design study.
|
|
08-017
|
(Not On Map)
|
|
Blueberry St/Northern Lights Blvd Area Pedestrian Safety
|
Category:
Pedestrian Improvements
Status:
Final Design phase
Scope:
This project will construct pedestrian safety improvements in and around the Blueberry Street/Northern Lights Boulevard intersection. Specific improvements will
more ...
|
|
08-019
|
(Not On Map)
|
|
Mountain Air Dr/Hillside Dr Extension
|
Category:
Road Improvements
Status:
Design Study phase
Scope:
This project will construct a new collector connection south of Rabbit Creek Road and east of Goldenview Drive. Improvements may include pavement, street ligh
more ...
|